
SEGMENT P2 · GENERAL CONTRACTING AND CONSTRUCTION
Control of incoming bulk volumes on a construction site
Control of incoming volumes on a construction site is a fact-based check that every delivered trip is real and the volume matches the statement. For general contractors bringing tens of thousands of cubic metres of sand and soil onto a site, IQoko installs a stationary or mobile CMP at the entry with CV-based volume estimation and ANPR. Without an independent measurement, the general contractor overpays subcontractors for "air." So every incoming trip is recorded in TripCode, and acceptance rests on fact rather than the carrier’s paperwork.
Who this matters to: Project manager, procurement director, construction-control service
50,000+
cubic metres of bulk on a site to be accepted by fact
CMP at entry
CV-based volume estimation of every incoming trip
Gate / Mobile
a stationary or mobile CMP for the site’s term and type
GENERAL CONTRACTING AND CONSTRUCTION
Where the general contractor overpays on deliveries
A general contractor overpays where the incoming volume is accepted on the carrier’s documents without an independent measurement. IQoko addresses exactly the fact-based acceptance.
Overpaying for "air"
A general contractor overpays when paying for deliveries on documents while the actual volume in the bed is less than declared. For the project manager, this is an inflated cost of materials on site. With a delivery of 50,000 cubic metres, even a small shortfall on each trip adds up to a large sum. IQoko provides a CV-based volume estimate for every incoming trip, so acceptance is by fact.
On-paper acceptance without measurement
On a construction site, incoming material is often accepted on the carrier’s consignment note without an independent volume measurement. For the construction-control service, this is acceptance "on trust" toward the party that delivers. IQoko records ANPR, video and CV volume of every trip in TripCode, so acceptance rests on the general contractor’s own record.
No data to resolve a dispute with the subcontractor
In a dispute about the actual delivery, the general contractor has nothing to present to the subcontractor besides the subcontractor’s own documents. For the procurement director, this is a weak position in claims work. IQoko stores video and a CV-based volume estimate for every incoming trip, so a dispute is closed with the TripCode record by trip number.
Temporary sites without permanent infrastructure
Linear and temporary construction sites have no permanent platform or scales for delivery control. For the general contractor, these are sites where stationary control can’t be deployed. IQoko Mobile is a self-contained CMP with its own power and LTE, so control of incoming volumes deploys without heavy installation and moves between sites.
CONFIGURATION
Recommended configuration for construction
For a general contractor, IQoko recommends a stationary IQoko Gate or a mobile IQoko Mobile at the entry plus IQoko Platform — depending on the site’s term and permanence. Stationary CMP — from 1 800 000 ₽; for temporary sites the mobile loop deploys without heavy installation, and IQoko computes the final quote on request.
IQoko Gate / Gate Pro
Stationary CMP at the site entry: ANPR, video and CV-based volume estimation (Gate Pro) for fact-based acceptance of incoming trips.
More about the productIQoko Mobile
Mobile CMP with self-contained power and LTE for temporary and linear sites without permanent infrastructure.
More about the productIQoko Platform
Cloud core: the TripCode log of incoming trips, delivery analytics, alerts, API and 1C/ERP integration. Servers in Russia.
More about the productStationary CMP — from 1 800 000 ₽; final quote on request.
ECONOMICS
How much you lose without control
Gauge the scale of losses on your own data. The calculation below is indicative; IQoko computes precise payback in a pilot using the site's actual figures.
Estimate your savings with IQoko
Gauge the scale of losses from opaque bulk-material transport and the payback period. Every assumption is editable.
Annual turnover affected by bulk-materials logistics.
Estimated losses from short-loading, padding and unaccounted trips. You can adjust this value to your situation.
Losses per year
7 000 000 ₽
Payback
2 mo.
The calculation is indicative and based on conservative assumptions. The loss share and IQoko cost are assumptions you can change; they are not an offer. We prepare a precise payback model on your data during the pilot.
Get a detailed calculationHOW IT LOOKS
How it looks on site
Before IQoko, deliveries are accepted on the carrier’s consignment note without measurement. After — every incoming trip on the construction site becomes a TripCode with CV volume, license plate and bed video at the entry.
CASE
Segment case
IQoko pilot projects in this segment are at an early stage. We'll add results with concrete savings figures once the pilots conclude.
TODO: real segment case — task, configuration, measured result (pilot figures).

