
SEGMENT P1 · QUARRIES AND AGGREGATES
Shipping control of bulk materials at a quarry
Shipping control at a quarry is a fact-based check of how much material actually left the site on each trip. For quarries and aggregate producers with 1000+ trips a month, IQoko installs a stationary CMP with ANPR and CV-based cargo-volume estimation at entry and exit. By industry estimates, 5–15% of turnover is lost to shipping opacity. So every trip becomes a TripCode digital record, and short-loading and theft are visible immediately.
Who this matters to: CEO, security director, finance director
5–15%
of turnover lost to opaque bulk shipping
1000+
trips a month at a target quarry under CMP control
100%
of trips with CV volume estimation and ANPR in the TripCode log
QUARRIES AND AGGREGATES
Where a quarry loses money on shipping
A quarry loses revenue where shipping can’t be verified by fact: on short-loading, padding and weighbridge collusion. IQoko addresses exactly these loss points.
Short-loading and material theft
A quarry loses material when the actual volume in the bed is less than the recorded one and there’s nothing to verify it. For the owner, this is a direct loss of revenue on every short-loaded trip. By industry estimates, short-loading and theft account for 5–15% of turnover lost. IQoko records a CV-based volume estimate for every trip, so short-loading is visible immediately.
Collusion and swapping at the weighbridge
The weighbridge gives a single weighing at a single point, which can be bypassed by collusion or vehicle swapping. For the quarry’s security team, this is a blind spot between loading and exit. IQoko links ANPR, video and CV volume into a single TripCode, so swapping the dump truck between control points is practically impossible.
Opacity of 1000+ trips a month
At 1000+ trips a month, manual shipping control is physically impossible. For the finance director, this means "trust-based" accounting without reconciliation against fact. IQoko Platform consolidates all trips into one log with alerts on volume deviations, so problem trips are flagged automatically.
Volume disputes with buyers
A quarry can’t prove the actual shipping volume to a buyer when a claim arises. For the commercial director, this is reputational and financial loss in dispute resolution. IQoko stores video and a CV-based volume estimate for every trip, so a claim is closed with the TripCode record by trip number.
CONFIGURATION
Recommended configuration for a quarry
For a quarry, IQoko recommends the IQoko Gate Pro + IQoko Platform pairing: a stationary CMP with CV-based volume estimation at entry and exit plus a cloud core with the TripCode log. Stationary CMP — from 1 800 000 ₽; the final quote depends on the number of cameras and integrations.
IQoko Gate Pro
Stationary CMP at entry and exit: 2–4 cameras, ANPR, CV-based volume estimation, material classification and weighbridge integration.
More about the productIQoko Platform
Cloud core: the TripCode log, analytics, volume-deviation alerts, API and 1C/ERP integration. Servers in Russia.
More about the productStationary CMP — from 1 800 000 ₽; final quote on request.
ECONOMICS
How much you lose without control
Gauge the scale of losses on your own data. The calculation below is indicative; IQoko computes precise payback in a pilot using the site's actual figures.
Estimate your savings with IQoko
Gauge the scale of losses from opaque bulk-material transport and the payback period. Every assumption is editable.
Annual turnover affected by bulk-materials logistics.
Estimated losses from short-loading, padding and unaccounted trips. You can adjust this value to your situation.
Losses per year
7 000 000 ₽
Payback
2 mo.
The calculation is indicative and based on conservative assumptions. The loss share and IQoko cost are assumptions you can change; they are not an offer. We prepare a precise payback model on your data during the pilot.
Get a detailed calculationHOW IT LOOKS
How it looks at a quarry
Before IQoko, shipping is recorded "on trust" as a single line in a log. After — every quarry trip becomes a TripCode with CV volume, license plate and bed video at entry and exit.
CASE
Segment case
IQoko pilot projects in this segment are at an early stage. We'll add results with concrete savings figures once the pilots conclude.
TODO: real segment case — task, configuration, measured result (pilot figures).

