From 1 September 2026 — electronic transport documents become mandatory. IQoko is ready for GosLog and OSSIG. Learn more

Loading aggregates into a dump truck at a quarry under IQoko control

SEGMENT P1 · QUARRIES AND AGGREGATES

Shipping control of bulk materials at a quarry

Shipping control at a quarry is a fact-based check of how much material actually left the site on each trip. For quarries and aggregate producers with 1000+ trips a month, IQoko installs a stationary CMP with ANPR and CV-based cargo-volume estimation at entry and exit. By industry estimates, 5–15% of turnover is lost to shipping opacity. So every trip becomes a TripCode digital record, and short-loading and theft are visible immediately.

Who this matters to: CEO, security director, finance director

5–15%

of turnover lost to opaque bulk shipping

1000+

trips a month at a target quarry under CMP control

100%

of trips with CV volume estimation and ANPR in the TripCode log

QUARRIES AND AGGREGATES

Where a quarry loses money on shipping

A quarry loses revenue where shipping can’t be verified by fact: on short-loading, padding and weighbridge collusion. IQoko addresses exactly these loss points.

Short-loading and material theft

A quarry loses material when the actual volume in the bed is less than the recorded one and there’s nothing to verify it. For the owner, this is a direct loss of revenue on every short-loaded trip. By industry estimates, short-loading and theft account for 5–15% of turnover lost. IQoko records a CV-based volume estimate for every trip, so short-loading is visible immediately.

Collusion and swapping at the weighbridge

The weighbridge gives a single weighing at a single point, which can be bypassed by collusion or vehicle swapping. For the quarry’s security team, this is a blind spot between loading and exit. IQoko links ANPR, video and CV volume into a single TripCode, so swapping the dump truck between control points is practically impossible.

Opacity of 1000+ trips a month

At 1000+ trips a month, manual shipping control is physically impossible. For the finance director, this means "trust-based" accounting without reconciliation against fact. IQoko Platform consolidates all trips into one log with alerts on volume deviations, so problem trips are flagged automatically.

Volume disputes with buyers

A quarry can’t prove the actual shipping volume to a buyer when a claim arises. For the commercial director, this is reputational and financial loss in dispute resolution. IQoko stores video and a CV-based volume estimate for every trip, so a claim is closed with the TripCode record by trip number.

IQOKO SOLUTION

How IQoko makes shipping transparent

IQoko installs a stationary CMP at the quarry’s entry and exit that measures the volume of every trip and links it to the license plate and video in a verifiable TripCode.

CV volume estimation for every trip

IQoko estimates the volume of bulk cargo in a dump-truck bed from a single camera with monocular computer vision — on entry and exit at the quarry. For shipping control, this is volume by fact without manual measurement or a laser frame at every CMP. So short-loading is recorded at the moment of exit, not discovered after the fact.

ANPR and a tamper-proof TripCode

IQoko recognizes each dump truck’s license plate (ANPR) and links it to the CV volume and video in a single trip TripCode. For the quarry’s security team, this is protection against vehicle swapping and weighbridge collusion. So every trip gains an evidence base that can’t be bypassed at a single control point.

A single log and alerts in IQoko Platform

IQoko Platform consolidates all the quarry’s trips into one TripCode log with analytics and alerts on volume deviations. For a manager, this is control of 1000+ trips a month without manually reviewing recordings. So the system itself flags short-loaded and anomalous trips.

Integration with scales and 1C

IQoko Gate Pro integrates with truck scales and delivers trip data into 1C via the IQoko Platform API. For finance, this is reconciliation of mass and CV volume in one log without double entry. So shipping enters accounting already confirmed by the trip fact.

CONFIGURATION

Recommended configuration for a quarry

For a quarry, IQoko recommends the IQoko Gate Pro + IQoko Platform pairing: a stationary CMP with CV-based volume estimation at entry and exit plus a cloud core with the TripCode log. Stationary CMP — from 1 800 000 ₽; the final quote depends on the number of cameras and integrations.

IQoko Gate Pro

Stationary CMP at entry and exit: 2–4 cameras, ANPR, CV-based volume estimation, material classification and weighbridge integration.

More about the product

IQoko Platform

Cloud core: the TripCode log, analytics, volume-deviation alerts, API and 1C/ERP integration. Servers in Russia.

More about the product

Stationary CMP — from 1 800 000 ₽; final quote on request.

ECONOMICS

How much you lose without control

Gauge the scale of losses on your own data. The calculation below is indicative; IQoko computes precise payback in a pilot using the site's actual figures.

Estimate your savings with IQoko

Gauge the scale of losses from opaque bulk-material transport and the payback period. Every assumption is editable.

Annual turnover affected by bulk-materials logistics.

0%
10%
20%

Estimated losses from short-loading, padding and unaccounted trips. You can adjust this value to your situation.

Losses per year

7 000 000 ₽

Payback

2 mo.

The calculation is indicative and based on conservative assumptions. The loss share and IQoko cost are assumptions you can change; they are not an offer. We prepare a precise payback model on your data during the pilot.

Get a detailed calculation

HOW IT LOOKS

How it looks at a quarry

Before IQoko, shipping is recorded "on trust" as a single line in a log. After — every quarry trip becomes a TripCode with CV volume, license plate and bed video at entry and exit.

Comparison of trip accounting without IQoko and with the TripCode digital trail
Without IQoko
Разделитель сравнения «Without IQoko» и «With IQoko»

OBJECTIONS

Quarry objections

Answers to common doubts of quarry owners and security teams about measurement accuracy, payback and the need for a CMP when scales already exist.

CASE

Segment case

IQoko pilot projects in this segment are at an early stage. We'll add results with concrete savings figures once the pilots conclude.

TODO: real segment case — task, configuration, measured result (pilot figures).

Let’s calculate how much your quarry loses

Book a demo or estimate the order of losses for your quarry’s turnover. Stationary CMP — from 1 800 000 ₽; IQoko prepares the final quote on request.